Single-machine Integrated Production Preventive Maintenance Scheduling: A Simheuristic Approach

Nurul Nadiah Abdul Halim, S. Sarifah Radiah Shariff, Siti Meriam Zahari

Abstract


Preventive maintenance (PM) planning becomes a crucial issue in the real world of the manufacturing process. It is important in the manufacturing industry to maintain the optimum level of production and minimize its investments. Thus, this paper focuses on multiple jobs with a single production line by considering stochastic machine breakdown time.  The aim of this paper is to propose a good integration of production and PM schedule that will minimize total completion time. In this study, a hybrid method, which is a genetic algorithm (GA), is used with the Monte Carlo simulation (MCS) technique to deal with the uncertain behavior of machine breakdown time. A deterministic model is adopted and tested under different levels of complexity. Its performance is evaluated based on the value of average completion time. The result clearly shows that the proposed integrated production with PM schedule can reduce the average completion time by 11.68% compared to the production scheduling with machine breakdown time.


Full Text:

PDF


DOI: https://doi.org/10.11113/matematika.v36.n2.1168

Refbacks

  • There are currently no refbacks.


UTM Logo

Copyright © 2016 Penerbit UTM Press, Universiti Teknologi Malaysia

Disclaimer: This website has been updated to the best of our knowledge to be accurate. However, Universiti Teknologi Malaysia shall not be liable for any loss or damage caused by the usage of any information obtained from this web site.

Best viewed: Mozilla Firefox 4.0 & Google Chrome at 1024 × 768 resolution.