[1]
Omar, M. and Supadi, S. 2003. A Lot-for-Lot Model with Multiple Instalments for a Production System under Time-Varying Demand Process. MATEMATIKA. 19, (Dec. 2003), 101–106. DOI:https://doi.org/10.11113/matematika.v19.n.506.