[1]
Bako, S.S. et al. 2018. Impact of Dependence on Parameter Estimates of Autoregressive Process with Gumbel Distributed Innovation. MATEMATIKA. 34, 2 (Dec. 2018), 365–380. DOI:https://doi.org/10.11113/matematika.v34.n2.941.