Omar, Mohd, and S.S. Supadi. 2003. “A Lot-for-Lot Model With Multiple Instalments for a Production System under Time-Varying Demand Process”. MATEMATIKA 19 (December):101–106. https://doi.org/10.11113/matematika.v19.n.506.