[1]
“Single-machine Integrated Production Preventive Maintenance Scheduling: A Simheuristic Approach”, MATEMATIKA, vol. 36, no. 2, pp. 113–126, Aug. 2020, doi: 10.11113/matematika.v36.n2.1168.